Noramco Announces Grand Opening of London, Ontario Location

July 17, 2023

On June 22nd, Noramco celebrated the Grand Opening of our New London branch, located at 1001 Green Valley Road in London ON.

This new 120,000 sq ft facility expands their operation significantly, allowing for a deeper variety and wider breadth of inventory. Additionally, they are able to house 5 cutting machines and can now provide same day delivery on cuts locally, emergency cable cutting and one stop shopping on most cable accessories. With this enlarged facility and greater capabilities, Noramco anticipates sustained growth in the Western Ontario market as they continue to expand their business and grow their service offering to their customers.

Source

Related Articles


Changing Scene

  • Arlington Wins NECA 2024 ShowStopper Award for Outstanding Product

    Arlington Wins NECA 2024 ShowStopper Award for Outstanding Product

    A 2024 NECA ShowStopper Award was awarded to Arlington’s Furred Wall Box Kits at the 2024 NECA Show on September 29 in San Diego, CA. Arlington’s Furred Wall Box Kits make challenging outlet box installations easy. There’s no need to break out concrete block, install furring strips, or foam around the box. UL Listed, large… Read More…

  • Growing Demand for Resilient Grid Solutions Drives S&C’s Latest Expansion

    Growing Demand for Resilient Grid Solutions Drives S&C’s Latest Expansion

    S&C Electric Company officially opened its new 275,000-square-foot manufacturing facility in Palatine, Illinois. S&C innovates and manufactures technology that advances a more intelligent, resilient, and reliable electrical grid. The Palatine expansion, announced in early 2023, created 200 production and engineering jobs and is approximately 25 miles from S&C’s 47-acre headquarters and manufacturing campus in Chicago’s Rogers Park… Read More…


Peers & Profiles