New PAC526 Wall Box from Legrand

EIN WallBox Legrand 400

April 2, 2021

Chief PAC526 Series Wall Boxes are now available through Wiremold. Contractors have been frequently requesting these wall boxes to install as part of electrical bid drawings. Electrical distribution is now able to stock this highly demanded product.

Key features of Chief PAC526 Series Wall Boxes include: 

  • Multiple depth break away edge allows compatibility with standard 3.5″ studs & 2.5″ studs
  • Pre and post construction installation options
  • Drywall and stud mountable
  • Knockouts for single gang outlets and 1-1/4″, 1″, & ½” conduit
  • Integrated universal zip tie anchor points
  • Landscape/Portrait installation
  • Stores a large variety of AV components
  • Paintable flange and cover options to blend in any environment
  • Black & white color options
  • Enclosure UL 2416 Listed for installation of AV, IT & Communication Technology Equipment

Download Content Pack (Legrand Direct)
Download Content Pack (Agency Partners)

Go HERE for more information

Related Articles


Changing Scene

  • Update on Potential Atkore Sale/Merger

    Update on Potential Atkore Sale/Merger

    November 26, 2025 Atkore is exploring options that could include a sale or merger of the whole company, and its Canadian operations form part of the North American footprint under review, although no specific changes to Canada have been announced.​ Atkore’s strategic alternatives process covers the entire business, which spans manufacturing and distribution facilities across the… Read More…

  • Schneider Electric and Albesol Partner to Provide Medium Voltage Premset Equipment in New $20M Mississauga Facility

    Schneider Electric and Albesol Partner to Provide Medium Voltage Premset Equipment in New $20M Mississauga Facility

    November 20, 2025 Schneider Electric Canada has announced the inauguration of a new $20M state-of-the-art Albesol facility in Mississauga, Ontario. Launching on November 20, the new location marks a key milestone in their shared mission to strengthen Canada’s energy infrastructure and supply chain resilience. The new facility is set to expand its workforce from 28 to 50 employees… Read More…


Peers & Profiles